SKU: 3201009223

Implementing BIM Processes in Daily Construction Operations

Sale price$36.00 Regular price$40.00
Save 10%

Pay in installments of $10.00 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 8 - Aug 13

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Implementing BIM Processes in Daily Construction OperationsCOURSE OVERVIEW: Welcome to the Implementing BIM Processes in Daily Construction Operations course. This program is designed to provide you with the skills, tools, and applied knowledge necessary to integrate Building Information Modelling (BIM) into day to day construction activities across Australian building and infrastructure projects. BIM is more than a digital toolit is a collaborative process that enhances communication, accuracy, and

COURSE OVERVIEW:

Welcome to the Implementing BIM Processes in Daily Construction Operations course. This program is designed to provide you with the skills, tools, and applied knowledge necessary to integrate Building Information Modelling (BIM) into day-to-day construction activities across Australian building and infrastructure projects.

BIM is more than a digital tool—it is a collaborative process that enhances communication, accuracy, and coordination throughout the construction lifecycle. This course begins by clarifying the role of BIM as a workflow approach, rather than a singular software application, and explores its evolution within Australian construction delivery. Participants will gain insight into how BIM supports planning, coordination, and quality control across daily site operations, enabling teams to work more efficiently, safely, and with greater precision.

Successful BIM implementation depends on clearly defined responsibilities. This section explores the roles of BIM Managers, Coordinators, and site-based BIM users, and how they interface with engineers, site supervisors, and subcontractors. Participants will examine strategies for communicating model expectations and responsibilities to all trades to ensure consistency and accountability.

Compliance with national and international BIM standards is essential. This section outlines key frameworks such as the National BIM Guidelines and ISO 19650, and how to apply them within site operations. Participants will learn how to adhere to project naming conventions, file structures, and data-sharing protocols to ensure interoperability, auditability, and industry alignment.

The BIM Execution Plan (BEP) is central to structured implementation. This section guides participants through interpreting project-specific BEP requirements, understanding defined workflows and approval stages, and applying these protocols to daily site tasks. The focus is on using the BEP as a living document that drives consistent model usage and governance onsite.

BIM supports dynamic construction scheduling through 4D modelling. This section explores how to link model elements to time-based sequencing, visualise upcoming construction milestones, and communicate planned work using model animations to improve coordination across teams and trades.

Daily model use requires effective navigation skills. This section introduces practical tools such as Navisworks, Revizto, and BIM360, enabling workers to access federated models on mobile devices or site kiosks. Participants will gain confidence in locating model elements, viewing object data, and interpreting the model hierarchy in real time.

BIM-driven coordination identifies design clashes early. This section outlines how to conduct clash detection reviews, interpret coordination reports, and participate in resolution workflows. Participants will learn how to escalate unresolved conflicts and update models collaboratively to reflect accurate site conditions.

Drawing extraction remains essential for site execution. This section explains how to produce 2D shop drawings from BIM models, validate their consistency with current design intent, and use model mark-ups to raise clarification requests. The focus is on reducing rework by maintaining tight alignment between documentation and live models.

BIM enhances procurement and logistics. This section explores how model components can be tagged with order and delivery data, allowing for just-in-time scheduling and real-time tracking of materials. Participants will learn to use the model to monitor delivery status and manage inventory effectively onsite.

Survey and layout tasks benefit from BIM accuracy. This section demonstrates how to export coordinate points for robotic total stations or GPS units, and how to align physical set-out with model locations for walls, penetrations, and slab edges. BIM-driven layout significantly reduces manual entry errors and rework.

Integrating safety planning with BIM is a growing practice. This section examines how to embed scaffolds, exclusion zones, and cranage plans into the model, simulate site stages using 4D safety modelling, and review emergency plans directly within the digital environment.

Subcontractor engagement is crucial to BIM success. This section provides guidance on enabling subcontractors to interpret model views, share trade-specific model data, and manage access through controlled permissions. Participants will also explore how to encourage model literacy across all site contributors.

Model-based issue management streamlines RFIs and problem resolution. This section explains how to raise RFIs directly from BIM elements, tag issues within Common Data Environment (CDE) platforms, and track resolution workflows through structured issue logs that tie back to site tasks and program timelines.

BIM improves quality assurance and defect tracking. This section introduces methods for embedding QA checklists into model workflows, spatially locating defects for clear communication, and linking remedial actions to handover documentation to support project closeout requirements.

Progress reporting is enhanced by visualisation. This section explores how to mark completed works in the model, reflect as-built conditions through updates, and use this data to support subcontractor claims, client updates, and verification of construction milestones.

Cost management benefits from integrated 5D BIM practices. This section examines how to extract live quantity take-offs, monitor material usage, and track cost impacts using the model. Participants will also explore how BIM can integrate with project control software to support cost forecasting and variation tracking.

A Common Data Environment (CDE) ensures model integrity. This section outlines how to manage documentation, model versions, and RFI workflows within a shared platform. Participants will learn to maintain version control, audit trails, and secure access for all model interactions.

BIM continues beyond handover. This section introduces Asset Information Modelling (AIM) for facilities management, including how to attach operation manuals, maintenance data, and warranty records to model elements. Participants will learn how to prepare models for export into FM software to support long-term asset lifecycle management.

By the end of this course, you will be equipped with the applied knowledge and tools to implement BIM processes effectively within daily construction operations—enhancing coordination, safety, quality, and accountability across all stages of on-site delivery.

Each section is complemented with examples to illustrate the concepts and techniques discussed.

LEARNING OUTCOMES:

By the end of this course, you will be able to understand the following topics:

1. Introduction to Building Information Modelling (BIM) in Construction Operations

  • Understanding BIM as a process, not just software
  • The evolution of BIM in construction delivery
  • Importance of BIM for daily coordination, planning, and quality

2. BIM Roles and Responsibilities on Site

  • Overview of roles: BIM Manager, BIM Coordinator, site-based BIM user
  • Interfacing BIM with site supervisors, engineers, and subcontractors
  • Communicating expectations to all trades using BIM

3. BIM Standards and Guidelines in Australia

  • Understanding the National BIM Guidelines and ISO 19650
  • Aligning with state infrastructure BIM requirements
  • Complying with naming conventions, file structures, and model protocols

4. BIM Execution Plan (BEP) and Project Protocols

  • Reviewing the BIM Execution Plan (BEP) for project-specific requirements
  • Roles, workflows, and approval processes in the BEP
  • Using the BEP to guide daily on-site BIM tasks

5. Integrating BIM into Construction Schedules

  • Linking BIM models to 4D construction sequencing
  • Using BIM to visualise upcoming works and milestones
  • Communicating planned works through model animations

6. Model Navigation and Viewing for Site Teams

  • Using model viewers
  • Understanding object properties, IDs, and model hierarchy
  • Accessing model data on tablets, kiosks, and mobile devices

7. Visual Coordination and Clash Detection

  • Identifying and resolving clashes between trades
  • Reviewing clash reports and conducting coordination meetings
  • Implementing site-level resolution workflows for detected clashes

8. Shop Drawing and Model-Based Documentation

  • Extracting 2D drawings from federated models
  • Ensuring alignment between shop drawings and latest models
  • Using model mark-ups for site clarification requests

9. Linking BIM to Procurement and Material Tracking

  • Tagging model elements with ordering and delivery data
  • Using the model for quantity take-off and procurement scheduling
  • Monitoring deliveries and locations through model-linked databases

10. Field Layout and Surveying with BIM

  • Exporting model points for use in robotic total stations or GPS units
  • Setting out walls, slabs, and penetrations using coordinated model data
  • Reducing manual entry errors through BIM-driven layouts

11. Integrating BIM with WHS and Site Safety Planning

  • Embedding exclusion zones, scaffolds, and crane plans into the model
  • Visualising safety staging through 4D simulations
  • Reviewing high-risk areas and emergency plans in the model environment

12. Subcontractor Engagement and BIM Enablement

  • Educating subcontractors on how to read and use models
  • Sharing simplified or trade-specific BIM views
  • Managing model access and version control for external partners

13. Request for Information (RFI) and Issue Management

  • Creating RFIs directly from model elements
  • Tagging issues and assigning actions within CDE platforms
  • Tracking and resolving queries through BIM issue logs

14. Quality Assurance and Defect Tracking via BIM

  • Embedding inspection checklists and QA forms into BIM workflows
  • Recording defects and resolutions spatially in the model
  • Linking QA data to handover documentation

15. Progress Tracking and Model Updates

  • Tagging completed works in the model for visual progress reports
  • Updating models to reflect as-built changes
  • Using progress data for subcontractor claims and client reporting

16. BIM for Cost Control and Quantity Management

  • Using 5D BIM for live quantity take-offs and cost tracking
  • Monitoring material usage and waste through the model
  • Integrating BIM data with cost estimating and project control tools

17. Common Data Environment (CDE) Usage Onsite

  • Accessing shared models, documents, and RFIs through a CDE
  • Managing model updates, approvals, and revision control
  • Ensuring version integrity and audit trail for all model interactions

18. Handover and Asset Information Modelling (AIM)

  • Preparing the model for facility management and client handover
  • Linking O&M manuals, serial numbers, and warranties to model elements
  • Exporting data for use in FM software platforms

COURSE DURATION:

The typical duration of this course is approximately 2-3 hours to complete. Your enrolment is Valid for 12 Months. Start anytime and study at your own pace.

ASSESSMENT:

A simple 10-question true or false quiz with Unlimited Submission Attempts.

CERTIFICATION:

Upon course completion, you will receive a customised digital “Certificate of Completion”.

Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 3201009223

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.7 ★★★★★
Based on 13 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
M
Verified Purchase
Meeshu
West Palm Beach, US
★★★★★ 5
My favorite sunscreen
Size: 6 Fl Oz (Pack of 1)
I love this sunscreen and have been carrying a can in my bag all this summer. To address a couple of common complaints: “It’s not sheer at all”: “Sheer” does not mean the same thing as “clear,” people. This spray is white and absolutely does rub in to be sheer as advertised. It leaves a slight (“sheer”) white tinge after rubbing in, but it’s not super noticeable on my pale skin. It might be more problematic on darker skin tones. (Also, it should be noted that there is literally no such thing as clear mineral sunscreen- you will have to choose between a product like this and a clear one containing endocrine disruptors. I’d rather look a little pasty, personally.) “My whole family used this and got burned”: You need to shake the can before spraying, as per the instructions. These sprays are made of zinc (the active, protective ingredient) in a liquid suspension. If you spray without shaking the can first, you risk getting all liquid and no zinc particles, and then yes, you will burn. I’m pretty sensitive and this sunscreen has not failed me yet. “It’s hard to get off”: This is true. It is hard to get off. But why would you want a sunscreen to come off easily?? This stuff is water resistant to an impressive degree. In the evening if it takes a vigorous scrubbing to get it off, I consider the exfoliation a bonus. Also, my nozzles have worked just fine and the cans last me quite a good amount of time.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on August 5, 2019
A
Verified Purchase
AlliCat0420
Louisville, US
★★★★★ 5
It really is water resistant
Size: 6 Fl Oz (Pack of 1)
This stuff is great. Normally when buying a green sunscreen, I have to sacrifice the aerosol feature and default to a lotion. This has a very neutral scent and sprays easily and evenly. It is zinc-based, so it will leave a white haze on your skin. I did need to rub it in after spraying, which helped minimize the white hue. It does love bathing suits, so be prepared to also rub the zinc powder into your bathing suit, otherwise it will be spray painted white. I used this while tubing and did not get burned--just nice and toasty-tan. The biggest downside is that it has a very slight stickiness/tackiness to it. I showered twice before I finally felt like it was all off my skin. But at least it didn't come off in the river!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 3, 2019
J
Verified Purchase
jlt
Dallas, US
★★★★★ 1
Leaves skin WHITE and chalky!
Size: 6 Fl Oz (Pack of 1)
This sunscreen is the worst. it leaves your skin feeling chalky, and totally white. it is difficult to get it off. I accidentally bought it twice two years apart thinking it was the one I liked, but nope. floated the river and even trying to rub it off in the water wouldn't remove the white cast on my skin all day. If you don't mind chalky skin and looking white, then go for it.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 11, 2026
H
Verified Purchase
HJK
Houston, US
★★★★★ 5
Great convenient nontoxic spray sunblock option that really works!
Size: 6 Fl Oz (Pack of 1)
I am very serious about nontoxic products for my family, particularly for my young children. I also insist on sunscreen almost every day. The unfortunate thing is that I really dislike actually applying sunscreen! lol! I don't mind on normal mornings (and we usually use the Green Screen Organic Sunscreen SPF 32 Original - Vegan - Gluten-free or Babo Botanicals SPF 40 Daily Sheer Facial Sunscreen, Unscented), but when we are on the go or at the beach, I wanted to make it as easy as possible to apply. We bought this for a beach getaway over the summer and it really surprised me. It is an easy application (shake, spray, rub) and it really worked. Two children and two adults used this on the entire body and face along with some extra stick protection on the face. I reapplied a few times, but not religiously and no one got a burn... no one really even got a tan. It says that it is sweat and water proof up until a certain point and I believe it really is because we were in scorching heat on the beach (in the water too) and no one had any issues. The great thing is that it really did make application easy so I think we reapplied more appropriately than we would have with a regular tube of sublock. I am not experienced with spray sunblocks so I cannot compare with others, but I believe it is similar. Note, since this is a nontoxic sublock that is zinc based, it does go on white and also sprays whatever it gets on white, but I didn't have any problems. It rubs in very easily and seemed to come off of carpet, clothes, etc. very easily as well. This is now a regular go-to for us even on non-beach days.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on November 12, 2018
B
Verified Purchase
Blueberry muffin
Chelsea, US
★★★★★ 3
Ok, but not great for the price.
Size: 6 Fl Oz (Pack of 1)
The good: 1. Doesn't have that typical sunscreen sent. (I hate that smell so that is a major plus for me.). 2. Doesn't burn my eyes 3. Doesn't clog my porse (some sunscreen gives me back acne) The bad: 1. On my skin (And I suspect anyone who has melanin ) it leaves a chalk-like film that makes me look ashy. 2. When you spray it IT GETS EVERYWHERE! On the floor, walls and pretty much tow feet from wherever you are standing. 3. I bought this at the 1st of the month it's 18th and the bottle is EMPTY! And I didn't even use it every day (obviously only used when I was outside in the sun.) 4. Feels chalkie on the skin. Overall while not a bad product, I will not be purchasing again too many issues and cons for the price.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 18, 2026

recommand products