SKU: 44161551010

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Sale price$197252505.00 Regular price$219169450.00
Save 10%

Pay in installments of $54792362.50 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 11 - Aug 16

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator PackageFor detailed specifications, please click on the "plus" icon to open each section below General Description: 54 I. D. x 20 S S 1440psi 4 Phase Skidded Test Separator Package Condition: Used Lightly Location: Alberta, Canada Price $300,000 USD each. (3 Identical Units Available) Warranty: No Warranty (Sale is As Is, Where Is Unless Refurbishment Quoted & Accepted) Dimensions: Width 122. 25 (3,105 mm) Length 444 (11,278 mm) Height 132. 25 (3,359 mm)

For detailed specifications, please click on the "plus" icon to open each section below


Description:
54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Condition:
Used – Lightly

Location:
Alberta, Canada

Price
$300,000 USD each. (3 Identical Units Available)

Warranty:
No Warranty (Sale is As-Is, Where-Is Unless Refurbishment Quoted & Accepted)

Dimensions:
Width 122.25” (3,105 mm)
Length 444” (11,278 mm)
Height 132.25” (3,359 mm)

Weight:
68,000 lbs (30,844 kg)

Tag:
V-101

Diameter:
54” I.D. (1,372 mm)

Length:
20’ S/S (6,098 mm)

MAWP:
1440 psi (9,928 kPa)

Design Temp:
130 F (54.44 C)

MDMT:
-50 F (-45.55 C)

C/A:
0.125” (3.16 mm)

Volume:
62 BBL (9.86 m3)

Phases:
4 Phase (Two Weirs – First Two Compartments c/w Sparge System)

Orientation:
Horizontal

PWHT:
Yes

Radiography:
RT-1

Year Built:
2012

Built By:
DynaCorp Fabricators

Heating Coil:
Yes – 4” single unit with (2) 1” Fig. 206 inlet/outlet connections

Sparge Piping:
Yes – (2) 1” 600# RF Nozzles c/w Tapped Hub Blind & 1” NPT 6M Ball Valve w/ Hex Plug

NOTE:
In February 2020 the vessel was re-rated to 1360 psi @ 195 F (9,377 kPa @ 90.55 C) through ABSA to achieve a higher vessel design temperature to work on high temperature wells. The original design pressure and temperature is still valid.



NOZZLE SCHEDULE:

ID# SIZE & RATING SERVICE

N1

6” – 600#RF

Inlet

N2

6” – 600#RF

Gas Outlet

N3

3” – 600#RF

PSV

N4

3” – 600#RF

Oil LC

N5 A/B

1” – 600#RF

Oil LG

N6

3” – 600#RF

Oil Outlet

N7

3” – 600#RF

H2O LC

N8 A/B

1” – 600#RF

H2O LG

N9

3” – 600#RF

H2O Outlet

N10 A/B

1” – 600#RF

Inlet LG

N11 A/B

3” – 600#RF

Drains

N12

1” – 600#RF

LSHH

N13

1” – 600#RF

PI

N14

1” – 600#RF

TI

N15

4” – 600#RF

Heat Coil

N16 A/B

1” – 600#RF

Sparge

M1/M2

20” – 600#RF

Manways


Located on the Separator Vessel (V-101) is the following instrumentation:
  • Switch High High (LSHH-101)
  • Level Alarm High (LAH-101)
  • Level Switch Low Low (LSLL-101)
  • Pressure Indicator (PI-100)
  • Pressure Switch Low (PSL-101)
  • Pressure Switch High (PSH-101)
  • Temperature Indicator w/ Thermowell (TI/TW-105)
  • 3” 1502F skid edge connection c/w 3”1502M cap w/ ½” tap & needle valve
  • “M1” Manifold Connection Point
  • Isolation Valve 4” 600# RF Ball Valve
  • Branch connection to Inlet By-Pass Manifold c/w 3” 600# RF Ball Valve
  • Removable flanged cushioned tees for elbows allow quick replacement of blind flange end or entire flange tee in the event of a wash out.
  • ½” High point vent included on top of inlet piping c/w ½” hex plug
  • Inlet Diffuser installed in vessel inlet nozzle
  • Gas Demister installed at vessel gas outlet nozzle
  • 6” 600#RF Gas outlet piping then reduced to 4” 600#RF upstream of gas meters
  • The 4” 600#RF piping is split into two Gas Meters, one is 4” and the other is 2”.
    • Meter #1 (FE-101)
      • (1) 4” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 4” 600#RF installed up & downstream of meter run
    • Gas Meter #2 (FE-102)
      • (1) 2” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 2” 600#RF installed up & downstream of meter run
  • The 4” and 2” 600#RF lines from the gas meters are combined into a single 4” 600#RF line then routed to the Back Pressure Control Valve (BPCV-101).
  • Upstream of the BPCV-101, the piping is branched off into a 3” control valve by-pass.
    • BPCV Isolation
      • (1) Isolation Ball Valve 4” 600#RF installed upstream
      • (1) Isolation Globe Valve 4” 600#RF installed downstream
    • BPCV By-Pass
      • (1) Globe Valve 3” 600#RF
    • Backpressure Control Valve (BPCV-101)
      • (1) 3” 600#RF CVS Control E Series Control Valve
      • c/w CVS 657 Size 45 Direct Acting (Fail Open) Actuator
      • Trim: TBC
    • Pressure Controller (PC-101)
      • (1) Fisher C1 Low Emission Pressure Controller
      • Sensing line tubed to upstream location
      • Supply line tubed from Fuel Gas System
  • The 4” line from BPCV-101 and the 3” 600#RF By-Pass lines are then tied together with a 3” 600#RF line and then run in parallel to skid edge. The 4” line is the “Sales Gas Outlet” and the 3” line is the “Flare Gas Outlet”. Both of these outlets are connected to each other and include isolation valves in the event inline operations need to be switched to flaring.
  • The 4” “Sales Gas” line from BPCV-101 is then reduced to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • After the branch for the Inlet By-Pass Manifold, the 3” 600#RF “Sales Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The 3” 600#RF “Flare Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M5” Manifold Connection Point.
  • Water Level Control and Level Gauges
    • The water level is controlled using (LC-101) a Fisher L2 liquid level controller using a displacer type sensor to detect the interface of the water and oil phases inside the vessel upstream of the last weir.
    • (2) level gauges “sight glasses” are provided for the water phases in the vessel. LG-101 is located upstream of the first weir and LG-102 is located upstream of the last weir.
      • Both Level Gauges include ½” Drain Ball Valves and are tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-101 consists of (3) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
      • LG-102 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The water outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and water metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “K” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main water outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into water line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-202 the Water Level Control Valve.
    • Water Level Control Valve (LCV-202)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Water Level Control Valve (LCV-202) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Water Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M3” Manifold Connection Point.
  • Oil Level Control and Level Gauge
    • The oil level is controlled using (LC-102) a Fisher L2 liquid level controller using a displacer type sensor to detect the level height of oil phase inside the vessel downstream of the last weir.
    • (1) level gauge “sight glass” are provided for the oil phase in the vessel. LG-103 is located downstream of the last weir.
      • Level Gauge include ½” Drain Ball Valves and is tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-103 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The oil outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and oil metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “Z” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main oil outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into the oil line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-201 the Oil Level Control Valve.
    • Oil Level Control Valve (LCV-201)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Oil Level Control Valve (LCV-201) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Oil Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M4” Manifold Connection Point.
  • On the upstream side of the first weir (dirty side) there are (2) two 3” 600#RF drain connections on the bottom of the vessel. Each drain connection has an Isolation Ball Valve 3” 600#RF. Between the vessel and isolation valves are Chemical Injection Points “W” and “X” (one each).
  • Downstream of the Isolation Ball Valves the lines are combined into the common drain header and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF Drain line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M2” Manifold Connection Point.
  • The vessel is fitted with a sparge system designed to accept high pressure water which is routed to a coil on the inside lower portion of the vessel. The high pressure water is sprayed from the sparge coil into the vessel to break up accumulated solids which are removed through the drain nozzles.
  • The vessel and process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-101). The PSV nozzle on the vessel is 3” 600#RF and piping reduced to 2” upstream of PSV-101.
    • PSV-101 Pressure Safety Valve
      • Axelson Model: 9A-46030-311A35Y
      • 2” 600# RF x 3” 150# RF
      • Pilot Operated
      • G Orifice
      • Set @ 1440 psi (9928 kPa)
      • Capacity: 41,109 SCFM
  • The 3” 150#RF PSV Discharge line is routed to skid edge. Included at skid edge is a cross over flange from 3” 1500#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The Instrument Air Scrubber inlet piping starts at Skid edge with 1” NPT Union to be connected to off skid air supply by others. The pressure reducing valve PRV-201 is located on the 1” inlet line and reduces the pressure to take set by the operator.
  • The scrubber and related process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-103). The PSV is located on the inlet piping of the Instrument Air Scrubber downstream of PRV-103.
    • PSV-103 Pressure Safety Valve
      • Taylor Valve Model: 82E4351311
      • 1” MNPT x 1” FNPT
      • Convention Type PSV
      • E Orifice
      • Set @ 150 psi (1034 kPa)
      • Capacity: 582 SCFM
  • The 1” PSV Discharge line is routed to skid edge and discharges to atmosphere near the roof line.
  • Installed in the outlet of the Instrument Air Scrubber is a high level shut off float. The purpose of this float is that as the vessel fills with liquid, the liquid will raise the float and once it reaches the top of its travel limit the float will block the flow of air out of the scrubber. The benefit to this shut off is that it prevents unwanted liquid from entering the instrumentation air supply lines and eventually entering the instruments and devices.
  • After the high level shut off, there is an instrument air manifold installed on top of the scrubber. Here there are (6) branches, each with its own pressure reducing regulator (PRV-101 to 106). Each of these PRVs is responsible for air supply to a specific instrument.
  • On the top of the instrument air manifold in a pressure indicator (PI-201) c/w ½” NPT needle valve.

Instrument Air Scrubber:

Tag:
V-103

Diameter:
6.065” I.D. (154 mm)

Length:
36” S/S (914 mm)

MAWP:
150 psi (1,034 kPa)

Design Temp:
649 F (343 C)

MDMT:
-20 F (-18.88 C)

C/A:
Nil” (Nil mm)

Volume:
x BBL (x m3)

Phases:
2 Phase

Orientation:
Vertical

PWHT:
No

Radiography:
No

S/N:
1007.11567

Year Built:
2012

Built By:
LO TECH MANUFACTURING

NOZZLE SCHEDULE:
ID# SIZE & RATING SERVICE

N1

1” – CLR 2M

Inlet

N2

1” – CLR 2M

Outlet

N3

3/4” – CLR 2M

Drain


  • This unit is equipment with a chemical injection system that consists of the following equipment
    • (2) Methanol Pumps (P-101 and P-102)
      • Haskel
      • Air Driven
      • Xx GPM (xx LPM)
      • Max Pressure: 10,000 psi (68,950 kPa)
    • (1) Chemical Storage Tank (T-800)
      • 500 gal. (1893 liters)
      • Pressure Relief Valve 7 psi / 0.5 psi Vacuum
  • The 1” NPT outlet line from the Chemical storage tank is routed through a filter than into the Chemical Pumps suction header.
  • The Pumps, HP chemical injection manifold and related tubing lines are protected from over pressurization by (1) Pressure Safety Valve (PSV-301). The PSV is located on the inlet of HP chemical injection manifold downstream of P-101 and P-102.
    • PSV-301 Pressure Safety Valve
      • Brand: Unknown Model: TBC
      • 1/4” MNPT x 1/4” FNPT
      • Set @ 1440 psi (9928 kPa)
  • The 3/8” PSV Discharge Tubing line is routed to the suction header for both pumps.
  • Alarms
    • LAH-101 is wired to exterior mounted Junction Box with a two position hand switch to enable or overside & silence the visual red beacon and audible siren alarm.
  • Shutdowns
    • PSL-101 / PSH-101, LSHH-101 and LSLL-101 are all pneumatic switches which are tubed back to an external mounted Junction Box with panel mounted indicators for Lo Level, Hi Level, Hi/Lo Pressure.
    • This junction box has two tubing connections, the first for air or nitrogen to charge the system and the second is to be connected to a pneumatic actuator mounted on an ESD valve located at the well head on the flow line

Style:
Oilfield Rollend

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Type:
Unit is fully enclosed in single building

Style:
Foam Panel Construction

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Height:
132.25” (3,359 mm)

Heaters:
Yes – (2) Electric Ruffneck Model: xxxx

  1. Building can be removed, and gas spools removed for transport to reduce height
  2. Refurbishment, retrofit, repackaging to customer specifications available upon request
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 44161551010

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.0 ★★★★★
Based on 10 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
N
Verified Purchase
Nathan D.
San Leandro, US
★★★★★ 5
Morrison Finishing With Style!
Format: Hardcover
The exciting conclusion to Morrison's fantastic, fascinating, and F***ing awesome Batman and Robin run. Bringing together all of the pieces of his past stories to a head and blowing it all up in your face! Not only is the book amazing in the way it delivers a great pay off to a satisfying story it also offers an amazing ride on the way there. On top of all that there is some fantastic behind the scenes stuff in the deluxe edition that offers some in site into Grant Morrison's creative process, and the execution of ideas + this book has some great joker moments and also sets up Batman Inc with the conclusion of his Batman and robin story, along with the nice inclusion of "Batman the return" a nice one shot that sets things up for the future. All in all well worth the wait, and is a must have for anyone following Morrison's run on Batman.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 19, 2011
S
Verified Purchase
saintwalker
Belleville, US
★★★★★ 4
Batman and Robin Will Never Die!!!!!!
Format: Hardcover
If you read Batman R.I.P. you saw those words shouted from the Dark Knight himself. This is the third volume of the popular Grant Morrison series Batman and Robin. This is also the conclusion of Grant's run on the book as well. We see a number of story lines finally reach their end. First thing first. I would recommend strongly that you purchase the first two volumes of this book. Just to give you a quick refresh this is not the Batman and Robin you are expecting. Richard Grayson is under the cowl, finally stepping in to the boots of his mentor. (Bruce was apparently murder by by Darkseid in Final Crisis.) The young lad who has taken the role of Robin is Damian Wayne. He is the son of Bruce Wayne and Talia al Ghul (daughter of Batman's nemesis Ra's al Ghul) . Let me say that this isn't your father's Batman and Robin. Well now that I think about it this isn't even my Batman and Robin. This is a Dynamic Duo for a new generation. Anyone who is familar with Dick Grayson either as Robin or Nightwing knows he is different from Batman. He is not the gloomy, dark and brooding character that Bruce is. Right away you will notice his Batman is different from his predecessor . (Heck, even Gordon and The Joker can tell). Dick's Batman may not be as dark as Bruce but he is not happy go lucky either. He has no problem opening a can of kick butt whenever it is needed. As for Damian this is a very different Robin as well. Robin was always light to Batman's darkness. The kid who says the one liners while Batman knock his foe unconscious. That is not the case here. Damian is dark, violent and a little of a brat most of time. Then again he was raised and trained by "The League of Assassins" since birth. I seriously doubt he has had the normal childhood others characters who wore the Robin mask did. Damian has no problem dishing out the pain either. Sometimes though he tends to dish out too much. In the past we seen him leave his opponents temporary cripple and with a concussion. This is the twist that I love about this book. The roles have been reversed. Batman is the lighter character and Robin is the dark one. What I also love about this book is we see the guy (Dick) who defined the sidekick role takes on a sidekick. Which is why we probably we see a lighter Batman. Dick is being the Batman he wanted. Bruce and Dick even though they were the original "Dynamic Duo" and define the hero sidekick role they still had their problems. It's great to see Dick become a father/big brother figure to Damian even if he is reluctant to it. This relationship is one of the best I have seen in comics for a long time. Now on to the story. As I said before the story "Batman must Die" brings to a close to Grants run on the book. I will not spoil anything but I will say it does not disappoint. We see Batman and Robin face what seems like impossible odds. A city in chaos and worst of all the Joker is in the middle. I will say one thing I love Grant's interpretation of the Joker and again like in "Batman R.I.P." he steals the show. I won't spoil too much but the Robin and Joker confrontation is great. (What happens when the Robin has the crowbar?) We also see you know who makes his return to Gotham as well. The big climatic fight scene is awesome. You see how much of a team that the current versions Batman and Robin have become. Speaking of which that is one of the biggest highlights in this book. We finally see these characters grow in to the new roles they have taken. When we first met Damian he was a brat who would not think twice about decapitating a criminal. I love watching him practicing restraint. This was the same character long ago who felt enemies should be dealt with no mercy. Now he is showing mercy. (Well some what) Despite what Damian has said he actually wants to change and be the hero that Dick and others believe he can be. I know some people might not like Damian because he is a brat and really obnoxious at times but I actually like him a lot. Damian is different from all the other Robins. Bruce trained Dick, Jason, Tim and even Stephanie the skills to be Robin and fight crime along side of him. Damian was thought to fight by assassins from birth. He has always had the skills. His path on being Robin is different than the others. He is being trained to be a hero. We finally see the hero he can be in this volume. In the first volume we saw Dick screaming to Damian about fighting as a team and working together. You almost had to wonder will this partnership even last? In this volume we actually see this Duo become Dynamic. We see Dick and Damian work as a team. We see Damian actually following orders. We actually see Dick and Damian become Batman and Robin. I didn't want to spoil much in my review because I didn't want to ruin a great story for any first time readers. Those who have already read this story know how it ends and where Grant will be taking the Batman Franchise in the future. I know sometimes Grant can go overboard and may lose many readers in a way too complex story but that is not the case here. I really hope Grant writes these characters again. Honestly its been a long time since I enjoyed a Batman book like this. I would recommend this book to any DC or Batman fan.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 17, 2011
R
Verified Purchase
Ryan C.
San Leandro, US
★★★★★ 5
The end to one of the most epic runs on ANY superhero character
Format: Hardcover
Way back when Grant Morrison first took over writing on Batman, you could begin to sense the epic storytelling approach he was going to have on this book. And boy did he ever. From way back then with introduction of Damian, to Bruce Wayne being stuck in time, a new dynamic duo in Dick Grayson as Batman and Damian as the new Robin, every area has been fun to read. This volume and The Return of Bruce Wayne (which should be read injunction with this book) mark a great exclamation point for Grant's run on these character. Yes I know, we now have Batman Incorporated. But as of this writing, Batman INC has been put on hiatus due to the New 52 being implemented at DC Comics. While difficult to follow without a flow chart, this book really culminated the past almost three years of stories that Grant has been building up. And all is done with such drama and action, your fingers can't wait to turn the page!
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on September 9, 2011
G
Verified Purchase
Garrett Wroblewski
Bozeman, US
★★★★★ 5
The New Era of Batman Begins NOW
Format: Hardcover
I just finished reading Batman and Robin: Batman and Robin Must Die- the deluxe edition by Grant Morrison. This book, collecting issues 13-16 of the series and the special Batman: The Return, is so good it almost makes up for the goofball s pectacle of Bruce Wayne dying and hurtling through time to fight sentient organic robots or something. I still don't get what the f*** was going on there. Not enough acid in the world... The entire city of Gotham made fiending addicts by a new airborne virus, the new Batman and Robin of Dick Grayson and Damien Wayne are overwhelmed by the scope of the problem. Throw in an allegedly reformed Joker masquerading as a detective, and a morbidly obese psychopath in a pig mask squealing with delight at his own torture and you have a dark return to form for the Bat-books which have been marred in self-indulgent existential nonsense for far too long. The art is lush and cinematic, each panel more gorgeous than the last. The highlight of the issue for any long-term Bat fan HAS to be the scene with the latest incantation of Robin locked in an interrogation room with the Joker, beating him within an inch of his life with a crowbar. Both an allusion to the Joker's murder of Jason Todd from back in the 80's and the classic interrogation scene from The Dark Knight, this entire scene hums with the fierce energy of live wires. Then Batman (Bruce Wayne... the "real" Batman) shows up and takes this series in an entirely new direction than has ever been attempted before. This isn't just some comic book, it is pop art of the finest caliber. Make sure to purchase the deluxe edition for delicious insights into the decisions made regarding characters and plots points, selections which were anything but arbitrary. Grade: A+
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on October 11, 2012
T
Verified Purchase
Torin McFarland
Fort Morgan, US
★★★★★ 5
Fantastic End to the Final Crisis Arc with Grant Morrison
Format: Paperback
Some of Morrison's best work, bar none. While The Return of Bruce Wayne in my opinion is the best of the Batman and Robin Volume 1-3 and Return of Bruce Wayne post-Final Crisis arc, this is also an excellent read / end to the Dick and Damian trilogy. The artwork is varied, eerie, phenomenal, though I recognize it is a love-it-or-hate-it style for some. Overall, I highly recommend this series, and this volume in particular is electrifying (ha!)
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 9, 2022

recommand products